Golden Mahseer and the Siang Project: Migration and Conservation
Golden Mahseer and the Siang Project
The proposed Siang Upper Multipurpose Project in Arunachal Pradesh may affect the migration routes and breeding grounds of the golden mahseer. The project is currently at the pre-feasibility study stage.

- If the dam is built, it could disrupt the movement of fish between the main river and its tributaries.
- The golden mahseer (Tor putitora) is a large, powerful freshwater fish found in Himalayan rivers. It is known as the ‘tiger of Indian rivers’.
- It occurs in the Indus, Ganges and Brahmaputra river systems and is the state fish of Arunachal Pradesh.
- It has golden-yellow flanks, large scales and two pairs of whisker-like sensory organs (barbels) near its mouth.
- It is listed as Endangered on the IUCN Red List.
- The golden mahseer migrates upstream from the main river into smaller tributaries to breed and later returns to larger rivers to feed. Its entire migration takes place in freshwater.
English
Question - Consider the following statements about the golden mahseer (Tor putitora).
I. It is a freshwater fish found in the Indus, Ganges and Brahmaputra river systems.
II. It is listed as Vulnerable on the IUCN Red List.
III. The proposed Siang Upper Multipurpose Project could affect its migration routes and breeding grounds.
Which of the above statements are correct?
A) I and II only
B) I and III only
C) II and III only
D) I, II and III
Answer - (B)
Explanation - The golden mahseer occurs in the Indus, Ganges and Brahmaputra river systems. It is listed as Endangered on the IUCN Red List. A dam on the Siang could disrupt its movement between the main river and its tributaries, limiting its access to breeding grounds.
More Current Affairs - Daily
- MINDMAP - Delimitation: Why Use the 2011 Census Instead of 2027? 28 Nov 2026
- Left-Wing Politics in India: History, Ideology and Today 28 Nov 2026
- Dalai Lama’s Escape: From Nehru’s Dilemma to India-China Tensions 28 Nov 2026
- Cash Transfer Schemes: Welfare, Fiscal Trade-Offs and Accountability 28 Nov 2026